Kerala House Construction Tips: This is the approved building plan for the house. I preferred a simple house plan without complication. Rooms must be spacious. Avoid structural congestion. So I cut staircase inside from house plan. I cut sit out also. No one will sit there. It normally uses for putting chapels. A small change is done to the house plan. So the space for sit out is added to the hall. We planned for a simple living by reducing kitchen utensils etc. So I avoided work area from the house plan. (But latter we felt that it was a mistake). Two bed rooms are attached. The living and dining becomes a square big space without any separation between the two. So it looks spacious.
Before digging foundation, we have to set out house plan on the plot by tying threads on several wooden posts. Special care to be given to calculate actual dimensions on the actual house plan, so that we will not have hard time getting small rooms than actual dimensions from approved plan. How much we have to dig depends on the type of soil on plot. Dig foundation pit till reaching a strong earth or hard soil. If the plot is with poor or loose soil then we have go deep. If there is water bed on plot then go for pillar foundation. This plot is with normal earth condition of strong structure. No water bed or poor soil. So two feet deep and two feet wide pit is taken for foundation. Sometimes people dig more than two feet. That depends on the quality of earth on plot.
setting out the house plan on plot |
digging foundation pit |
At the base part, a cement concrete is done. Foundation is coming over this metal concrete. Pour water for two days.
After completing this, started putting rubble (size-stone) on to the pit. No need to use cement mortar (ചാന്ത് ) to make foundation on such type of earth. Fortunately there were no need had come to arise pillars. That has reduced the cost for it.
Placing rocks on pit |
Place rubble by filling gaps with stone pieces. If you prefer to do an extra care to foundation follow these steps:
After completing foundation work, fill gap with rock waste sand and inforce water onto it to fill the gap completely. This gives extra strength to foundation.
After finishing filling stones by two feet height, then put an even layer of cement plaster on top. It is better to water for two days before starting basement.